Richmond Landfill P3 Building
A new pump building at Waste Management site needed and Ubcon was happy to be selected as the contractor to build it. The building was build using poured footings and foundation walls, 8” block walls with spray foam and steel cladding and a wood truss roof with steel roofing. The interior was completed with all the pumps and controls required to move the leachate form storage tank to trucks.